The public BWSSB grievance page exposes fields for consumer/mobile, subject, application number/name, address, plumber name, and remarks, with 1916 and an email contact displayed on the page.
Evidence BRecord verifiedBasis observation
Read this with itOnly the blank public form was inspected; no personal details or grievance were submitted.
The manual's demand-note wording describes RWH, and where applicable STP/dual piping, KSPCB consent, and additional billing until OC as conditions before service; it states a 90-day demand-note validity period and a Cashfree or PayU online payment/receipt flow.
Evidence CRecord partialBasis observation
Read this with itManual/demand-note wording, not a case-specific obligation or approval. The original official endpoint is currently unavailable; this claim is retained as incomplete historical/public evidence, not a current complete procedure.
BWSSB's FAQ says that after AE/JE inspection, charges such as prorata and GBWASP are calculated and a demand note is raised; after AEE approval the applicant is notified and can pay through the payment-history tab, with an e-receipt after successful payment.
Evidence BRecord partialBasis observation
Read this with itPublished FAQ route; no inspection, demand note, payment, or receipt was observed.
The current public Jaladhare page exposes a mobile-number OTP entry, an application-number status lookup, and a Show All Application link; it says to use the same mobile number to know application status.
Evidence CRecord partialBasis observation
Read this with itOnly controls and labels were inspected. No phone number, OTP, application number, or property data was entered. The original official endpoint is currently unavailable; this claim is retained as incomplete historical/public evidence, not a current complete procedure.
One public complainant reported that RTI, officer, and online-complaint escalations in their new-connection case were closed without resolving the reported physical connection gap.
Evidence ERecord partialBasis observation
Read this with itA single report of attempted recovery, without the submissions, case records, closure reasons, or later outcome. It does not show that public escalation routes are generally ineffective.
One public complainant reported that, after being assigned a BWSSB RR number and meter for a new connection, the supply line had not been provided and the meter had not been attached to the water line.
Evidence ERecord partialBasis observation
Read this with itA single complainant's account of a physical-completion gap. It does not establish that RR-number or meter assignment normally precedes line connection, or the cause, duration, or prevalence of the reported gap.
One public complainant reported being asked by a plumber for payment outside the stated demand note to complete a new water connection.
Evidence ERecord partialBasis observation
Read this with itThis records a reported request, not an authorised BWSSB charge, an established demand, or wrongdoing by any person or organisation.