The current public Jaladhare page summarizes the route as mobile login, payment to buy the application form, filling details and uploading documents, followed by status tracking; it labels the service as permission for a new or additional water-supply and underground-drainage connection.
Evidence BRecord verifiedBasis observation
Read this with itHigh-level public wording only; it does not prove the exact current post-login transition or eligibility.
On 2026-08-28 the public Jaladhare status section displayed headings of 14 days for residential connections and 42 days for commercial and high-rise connections.
Evidence BRecord partialBasis observation
Read this with itDisplayed target headings are not treated as a guaranteed service level. The public metrics were blank and the clock-start event is not stated.
The manual describes a Review screen with tentative charges based on entered inputs, prorata, standard, and GBWASP/BCC tables, a total-payable display, and a declaration that incorrect information may lead to rejection.
Evidence CRecord partialBasis observation
Read this with itThe manual's examples do not establish a current amount or fee formula for a particular property. The original official endpoint is currently unavailable; this claim is retained as incomplete historical/public evidence, not a current complete procedure.
BWSSB's FAQ says that after AE/JE inspection, charges such as prorata and GBWASP are calculated and a demand note is raised; after AEE approval the applicant is notified and can pay through the payment-history tab, with an e-receipt after successful payment.
Evidence BRecord partialBasis observation
Read this with itPublished FAQ route; no inspection, demand note, payment, or receipt was observed.
BWSSB's FAQ says the plumber should be BWSSB-registered, plumber details may be changed before final payment, and a scanned consumer/registered-plumber agreement should be attached before final payment.
Evidence BRecord partialBasis observation
Read this with itPublished FAQ guidance; no plumber was selected and no agreement was uploaded.
BWSSB's FAQ says status can show the application's stage and designation, ward/service-area selection routes it to the concerned sub-division AEE, engineers may contact the registered number, and the engineer should pre-inform the applicant of an inspection visit.
Evidence BRecord partialBasis observation
Read this with itOfficial FAQ guidance, not a case observation; its email/password route differs from the current mobile-OTP entry.
The manual describes floor-by-floor building rows with purpose/type and amenity or parking details and a plumber-selection section; it says that if RWH is marked yes, plumber selection and a mutual agreement are mandatory.
Evidence CRecord partialBasis observation
Read this with itManual-described behavior; live plumber eligibility and current RWH enforcement were not tested. The original official endpoint is currently unavailable; this claim is retained as incomplete historical/public evidence, not a current complete procedure.
The official consumer manual describes a five-screen sequence: Consumer Details, Site Details, Building Details, Documents, and Review.
Evidence CRecord partialBasis observation
Read this with itOfficial manual sequence; post-login screens were not opened in a live account. The original official endpoint is currently unavailable; this claim is retained as incomplete historical/public evidence, not a current complete procedure.