The public JVS eligibility page lists as not eligible: premises attracting line extension or electrical-network modification; buildings over 15 metres and over 500 sqmt total plinth area; premises requiring an Occupancy Certificate; buildings attracting Clause 9 Conditions of Power Supply; unauthorised, revenue or abandoned layouts; HT category; and incomplete wiring, meter board or service-main cable.
Evidence BRecord verifiedBasis observation
Read this with itPublished list only; no property-specific determination.
The public JVS form exposes eight tabs: `Application type`, `Provide Temporary Account Id`, `Personal Details`, `Power Supply Required at (AD.)`, `Correspondence Address`, `Location Details`, `Miscellaneous Details`, and `Document Upload`; the initial panel exposes `Single` and `Multiple Connection`.
Evidence BRecord verifiedBasis observation
Read this with itBlank form only; Single was selected to reveal the next stage.
BESCOM’s public FAQ says that if money is debited but payment acknowledgement is not generated, do not pay again for the same bill; wait 24 hours for Bill Desk to confirm with the bank and update payment, or use the published Bill Desk telephone 080-25586664 and Customer Care 1912.
Evidence BRecord verifiedBasis observation
Read this with itPublished recovery text; the FAQ’s email transcription was incomplete and is intentionally not presented as a usable address. No payment was attempted.
The public BESCOM home exposes JVS Fast Track Services with New Connection and Track New Connection links, a separate EODB New Connection label, a normal Other Services New Connection link, and a public Help label calling 1912.
Evidence BRecord verifiedBasis observation
Read this with itObserved on 2026-08-30 without login or case data.
The public JVS eligibility page says that if an application is rejected for non-compliance with eligibility criteria or requested Load, Tariff or Name modification, registration and GST are excepted, MSD/AISD deposits and SLC/ASLC non-revenue charges are refunded, and all other charges are forfeited; it separately says that where an applicant does not desire power supply and has not executed the agreement, amounts are refunded after deducting 10% of the total amount under Clause 4.03 Note of KERC.
Evidence BRecord verifiedBasis observation
Read this with itPublished wording only; no rejection or refund was observed.
The public BESCOM New Connection Tracker exposes `Request ID*`, an `OR` separator, `Account ID*` and a `Submit` button.
Evidence BRecord verifiedBasis observation
Read this with itNo identifier was entered and Submit was not activated.
BESCOM's public FAQ lists document classes including registered sale/gift/partition deed, khata, latest tax receipt, registered lease, occupancy certificate, solar-water-heater compliance, identity/address and other conditional technical or undertaking documents; the eligibility page requires prescribed documents to be verified with originals and lists power-supply agreement and contractor completion/test report conditions.
Evidence BRecord partialBasis observation
Read this with itThe list is not a universal checklist; requiredness depends on category, premises, load, and route.
BESCOM's eligibility page says Janasnehi fast-track applies to LT-1 domestic and LT-3 commercial services up to 18 kW excluding 18 kW, including new and tapping connections, and excludes line-extension/modification cases, certain tall/large or unauthorised premises, HT category, and incomplete wiring/meter-board/service cable.
Evidence BRecord partialBasis observation
Read this with itEligibility page wording is current public guidance, not a property-specific decision.
BESCOM's FAQ says that for normal new connection, only the application fee can be paid online and remaining additional charges are paid by visiting the SDO office; the actual amount and applicable route are not known without a case.
Evidence BRecord partialBasis observation
Read this with itDo not generalize this payment statement to every JVS/EODB category.
BESCOM's FAQ and home page describe the Janasnehi fast-track load ceiling as up to 17.5 kW, while the eligibility page says up to 18 kW excluding 18 kW; the applicable threshold should therefore be confirmed for the chosen route.
Evidence BRecord partialBasis observation
Read this with itThis records a wording difference, not a resolved legal threshold.
BESCOM's public FAQ describes a JVS New Connection entry that can be opened without customer-portal login, followed by a disclaimer, single/multiple choice, optional temporary-account-ID lookup, personal/address/location/load details, document upload, submission, and a confirmation charge breakdown or demand-letter download.
Evidence BRecord partialBasis observation
Read this with itOfficial public guidance/form rechecked 2026-08-30; no application, payment, or demand was created. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route.
BESCOM's public eligibility guidance limits JVS fast-track to LT-1 domestic and LT-3 commercial services up to 18 kW excluding 18 kW, including new connections, and lists line-extension/modification, specified tall/large premises, occupancy-certificate premises, Clause 9 cases, unauthorised/revenue/abandoned layouts, HT category, and incomplete wiring/meter-board/service cable as exclusions or barriers.
Evidence BRecord partialBasis observation
Read this with itThis is page-level eligibility guidance, not a property-specific decision. The FAQ separately uses a 17.5 kW ceiling; the difference remains unresolved and is preserved as a route-confirmation blocker.
The blank JVS form exposes Temporary Account Id with `Get Details` and `Skip`; Personal Details with Business/Personal, Applicant Name*, Gender (Select/Male/Female/Others), Email ID*, Joint, Phone Type* (Select/Mobile/LandLine), Phone Number*, ID Type* (Driving License Number/PAN/PASSPORT/TAN/UID/Aadhar Number/Voter’s ID), ID Number*, check-icon and Save & Continue; address/correspondence with address line 1*, address line 2, City*, disabled State Karnataka, disabled Country India, Pincode*, and Copy Address Same As Above; Location Details with Latitude*, Longitude*, Area of Site (Sqft)*, Stilt Floor Available* (Select/Yes/No), Total No of Floors (Including Stilt floor)*, Total built up area(m²)* and Save & Continue.
Evidence BRecord partialBasis observation
Read this with itNo account, personal, contact, identity, address, location or building value was entered. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route.
The blank JVS Document Upload stage shows `Upload Documents - Please upload any one of the document for mandatory (*) category`, accepted extensions `.JPEG, .JPG, .BMP, .TIF, .TIFF, .JPE, .JFIF, .PDF, .GIF`, `Max Total Upload Size : 4 MB`, DigiLocker file and Document Status columns, Choose File for Identity Proof*, Proof of Ownership*, Geo-Tagged building photo* and Completion Certificate, a Get Aadhaar from Digilocker link, and a final Submit.
Evidence BRecord partialBasis observation
Read this with itNo chooser, DigiLocker action or Submit was activated. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route.
The public JVS eligibility page states that JVS covers LT1 Domestic and LT3 commercial tariff loads up to 18KW excluding 18KW for new single or multiple connections and exposes the exact controls `I have read and agree to the Terms and Conditions for Account Registration*`, `OK`, and `Cancel`.
Evidence BRecord partialBasis observation
Read this with itCheckbox/OK only opened the blank form; no case eligibility was decided.
The blank JVS Miscellaneous Details stage exposes Power Supply required for* (Select/Domestic-LT1/Commercial-LT3/EVC-Station-LT6C), Postpaid/Prepaid radios with Postpaid initially checked, Premise Location* (BBMP/BDA/Rural Local Body or Village or Gram Panchayat/Urban Local Body or CMC or TMC), Sub Division Office*, Section Office*, Nature of Business*, Required Load* from 240W through 17.5KW, Required Phase* (Single Phase/Three Phase), AEH / Non AEH Phase, Required Voltage* (230 V/440 V), Type Of Power* (Motive/Lighting/Light & Heat) and Save & Continue.
Evidence BRecord partialBasis observation
Read this with itVisible options are not a case-specific allowable-load decision. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route. This is a grouped control inventory, not proof that every listed item is required, available in every case, or completes an end-to-end route.
BESCOM’s public FAQ displays `3 working days (24 hours) after registration and payment made.` for FTNC.
Evidence BRecord partialBasis observation
Read this with itSpecific FAQ observation only; it does not establish a case clock or supply outcome.
BESCOM's home page displays power supply within 24 hours after requisite-fee payment for qualifying domestic LT-1 and commercial LT-3 consumers up to the fast-track load limit where no line extension is needed; it also displays a Bengaluru EODB new-connection target of 7 days without RoW and 15 days with RoW for stated LT/HT load bands.
Evidence CRecord partialBasis observation
Read this with itDisplayed service targets are conditional labels, not a guarantee for an unclassified property or a proof that payment starts the clock in every case. Downgraded from Grade B on 2026-08-29: the available citation is a general-site reference rather than claim-specific evidence.
The public BESCOM materials expose a JVS New Connection route that does not require customer-portal login, and a normal New Connection route under Other Services for LT/HT/EHT/MC/MSB categories.
Evidence BRecord verifiedBasis observation
Read this with itNo route was submitted.
The public form displays stages for application type, temporary/permanent or temporary account ID where applicable, personal details, supply address, correspondence address, location, miscellaneous details, LEC details where applicable, and document upload.
Evidence BRecord verifiedBasis observation
Read this with itBlank controls only; no personal or property value was entered.
The public FAQ says submission leads to a confirmation page and charge breakdown/demand letter; for normal new connection it says only the application fee can be paid online and remaining additional charges are paid at the SDO office.
Evidence BRecord partialBasis observation
Read this with itNo demand, payment, or receipt was generated.
The public eligibility page excludes or conditions JVS cases involving line extension/modification, certain tall or large buildings, occupancy-certificate premises, unauthorised/revenue/abandoned layouts, HT category, and incomplete wiring/meter-board/service cable; public pages also differ between 17.5 kW and 18 kW-excluding-18 kW wording.
Evidence BRecord partialBasis observation
Read this with itNo property-specific eligibility decision was attempted.
KERC's 2022 consumer-rights regulation says an owner or occupier files the electricity-supply application with prescribed fee/charges, and an online submission through the licensee's web portal or mobile app must generate an acknowledgement with a registration number; a complete application is deemed received on that acknowledgement date.
Evidence ARecord verifiedBasis observation
Read this with itRegulation clauses 3(1)(a)-(b) and 3(2), official PDF accessed 2026-08-30. This legal acknowledgement rule does not prove that BESCOM's blank form was submitted or that a specific case is complete.
BESCOM public guidance lists ownership/occupancy, tax, identity/address, solar-water-heater, agreement, wiring and contractor test-report document classes, with requiredness depending on the chosen category and premises.
Evidence BRecord partialBasis observation
Read this with itDo not treat the FAQ's long list as a universal checklist.
BESCOM displays conditional targets of 24 hours after requisite-fee payment for qualifying JVS domestic/commercial cases without line extension and 7/15 days for stated Bengaluru EODB load bands depending on RoW.
Evidence CRecord partialBasis observation
Read this with itDisplayed targets do not establish a case clock or guarantee supply. Downgraded from Grade B on 2026-08-29: the available citation is a general-site reference rather than claim-specific evidence.
One citizen reported that a downstream service treated their BESCOM account as a new connection and that the reported recognition issue resolved only after a later billing cycle.
Evidence FRecord partialBasis observation
Read this with itA historic commenter account about a separate downstream service. It does not establish meter activation, billing-cycle timing, data synchronisation behaviour, or any scheme entitlement.